| American Canyon High School |
| CHPS Verified Project in Progress |
|
School Information
|

|
|
School District:
|
Napa Valley Unified School District |
| Completed: |
Spring 2009 |
| Students: |
2,200 |
| Size: |
258,000 square feet |
| Architecture Firm: |
Quattrocchi Kwok Architects
|
| CHPS Scorecard (2006 Edition) |
|
| Site: |
9 |
| Water: |
5 |
| Energy: |
6 |
| Materials: |
2 |
| IEQ: |
10 |
| District Resolutions: |
0 |
| TOTAL: |
32 |
| - Mimimum of 32 points required of possible 85. |
| High Performance Features |
The school's project will be the first to claim all 5 points available for water efficiency, will include a solar energy system and treat stormwater on site. .
|
| Back to CHPS Schools Page. |