| Valley Region High School #6 |
| CHPS Project in Progress |
|
|
School Information
|
|
School District:
|
Los Angeles Unified School District |
|
| Completed: |
N/A |
|
| Students: |
|
|
| Size: |
|
|
| Architecture Firm: |
MVE Institutional, Inc.
|
|
| CHPS Scorecard (2002 Edition) |
| Site: |
10 points |
|
| Water: |
1 point |
|
| Energy: |
6 points |
|
| Materials: |
2 points |
|
| IEQ: |
11 points |
|
| District Resolutions: |
5 points |
|
| TOTAL: |
35 points (mimimum of 28 points required of possible 81) |
| High Performance Features |
- Installation of a cool roof to reduce energy usage
- Fillters for stormwater management
- Exceeds Title 24 by over 25%
- 75% of all construction and demolition waste to be recycled
- 90% meet the CHPS daylighting standard
- Ducted returns on the HVAC to prevent dust and microbial growth in occupied areas
- All classrooms have operable windows with lighting controls
|
| Back to CHPS Schools Page. |